114mm Spiral Pile
Classification :
PRODUCT DETAILS
Product Description
Screw pile are a new type of pile foundation material. They are screwed into the ground by rotation and directly used as pile bodies to provide stable support for the upper structure.
It is mainly composed of spiral blades, steel shafts and flanges. The spiral blades are the core part and are welded onto the steel shafts. Their quantity, diameter and spacing are designed according to engineering requirements. The steel shafts are made of high-strength steel and undergo hot-dip galvanizing treatment to enhance corrosion resistance. The flanges are located at the top and are used to connect the load-bearing structure.
Parameter
| Product name | Screw pile |
| Material | Usually, Q195, Q215, Q235, Q255, Q275 and other types of steel are adopted. |
| Surface treatment | And after undergoing hot-dip galvanizing treatment, the thickness of the galvanized layer is approximately 60μm - 80μm, in order to enhance the corrosion resistance. |
| Pile diameter in mm | 48mm 68mm 76mm 89mm 102mm 114mm 140mm 219mm 299mm |
| Length in mm | It can be processed to 6000mm as per requirements. The commonly used lengths range from 580mm to 3000mm. |
| Wall thickness mm | Generally, there are 2.5mm, 2.75mm, 3.0mm, 3.25mm, 3.5mm, 4.0mm, etc. The greater the wall thickness, the higher the strength and stiffness of the pile body. |
| Screw blade | Thickness: Usually around 3mm - 10mm, which determines the strength and wear resistance of the blades. Diameter: For example, a spiral pile with Φ76*4, the diameter of the spiral blade might be 0.176m. Spacing: The spacing between the blades is most effective when it is 3-4 times the S/D ratio. For a general Φ76*4 spiral pile, the optimal distance S between two blades is between 0.53m and 0.7m. |
| Nut hole diameter | It is used to connect the pile body with the upper structure and needs to match the connecting bolts. The bolt hole diameter of the YH-J series spiral ground piles is M16. |
| OEM | OEM available ,follow customer requirements |
| Packing | Bundle, or with all kinds of colors PVC or as your requirements |
| MOQ | 1 tons |
| Lead Time | within 15-30 days after received deposit or irrevocable L/C at sight |
| Sample | Free sample available |
| Payment Term | T/T or L/C at sight |
| Production ability | 120000MT per year |
Factory description
The factory covers a vast area and has several modern large-scale production workshops, with a total area of [X] square meters. The layout inside the workshops is well-organized, and the operation areas for cutting, shrinking, welding, hot-dip galvanizing, and finished packaging are clearly defined in each stage.
We have a series of advanced production equipment. Among them, the CNC laser cutting equipment can precisely cut raw materials according to the design requirements, ensuring dimensional accuracy; the automatic welding blade equipment, automatic welding nut equipment, and automatic welding gasket equipment greatly improve the welding efficiency and quality, ensuring uniform and firm weld points. In addition, there are CNC automated presses, 315-ton presses, and other equipment that can meet the stamping requirements in the production process of different specifications of spiral ground piles. The factory also has several shrinking machines, pushers, and stamping equipment, with a total number of over [X] units. At the same time, to ensure product quality, a complete set of inspection equipment is provided to conduct strict quality inspection at each production stage.
In terms of surface treatment, the factory has [X] hot-dip galvanizing production lines, strictly following the GB/T 13912—2002 quality standard, which enables the surface of the spiral ground piles to form a uniform and dense galvanized layer, effectively enhancing the corrosion resistance of the products. In addition, there are [X] spraying production lines that can provide spraying services of different colors and different protection levels according to customer needs.

Shipping Packaging

Application description:
It is widely applied in fields such as building foundations, photovoltaic projects, municipal engineering, and temporary structures. For example, in the construction industry, it is used for the foundation support of residential buildings and commercial buildings; in photovoltaic projects, it serves as the supporting base for solar photovoltaic panels; for municipal facilities like street lamps and signal signs, it is used for infrastructure construction; and it is also applicable to temporary buildings such as mobile houses and tent fixation.

Why Choose Us?
1)The products can be made completely according to the customer's requirements, and we have our own factory.
2)High quality product and good price.
3)Good Pre-sale、on sale and after sales service.
4)Short delivery time.
5)Exported all over the world, with rich experience.
FAQ
Q:What is a screw pile?
A:A screw pile is a specially designed underground pile with a spiral structure. It can be directly inserted into the soil during construction and is used to support buildings or other structures.:A:Yes. Customization is available. You can choose the color or pattern, size (length, width, thickness, weight, etc.), paints, shape, etc. We offer coils and sheets, as well as further processing services, such as logo printing, etc. Please send us your requirements, we will meet your requirements.
Q:How to maintain screw piles?
A:The maintenance of screw piles mainly focuses on regular inspections of their bearing capacity, displacement conditions, and the stability of the surrounding soil, to ensure their long-term safe use.
Q:Why is the anti-corrosion treatment of screw piles important?
A:The hot-dip galvanizing process can effectively enhance the corrosion resistance of the piles, extend their service life, and ensure their durability in various environments.
Q: Are we a trader or a manufacturer?
A: We are a manufacturer and have our own factory.
Q: How to pack?
A: Can be packaged according to customer's needs
Q: How long is your delivery time?
A: If the goods are in stock, generally 5-10 days. Or 15-20 days if the goods are not in stock, according to the quantity.
CUSTOMER FEEDBACK
Customer Feedback
Customer Feedback
Customer Feedback
Customer Feedback
Quality Assurance, Honesty, Trustworthiness
FAQ
Q8: How do you make our business long-term and good relationship ?
Q7:Can we get the some samples?Any charges?
Q6:How can we get the offer?
Q5: How long is your delivery time?
Q4: Can you arrange the shipment?
Q3: Do you have quality control?
GET A FREE QUOTE